In 2010 Rogesa executed a reline of its blast furnace No. 5 within a downtime period of 102 days. This report shows a very detailed description of the situation at ROGESA in Dillingen/Germany with regard to the operated blast furnaces and their performance during the different campaigns. The work which was carried out is shown thoroughly and the time schedule is explained. A major part in this report comprises the methodology of the erection of the new blast furnace shell. A specific topic amongst others is the installation of the new Paul Wurth BLT®GEN3 gear box to optimize the charging process and fuel consumption. Finally, the successful blow-in results are shown.
In 2010 Rogesa executed a reline of its blast furnace No. 5 within a downtime period of 102 days. This report shows a very detailed description of the situation at ROGESA in Dillingen/Germany with regard to the operated blast furnaces and their performance during the different campaigns. The work which was carried out is shown thoroughly and the time schedule is explained. A major part in this report comprises the methodology of the erection of the new blast furnace shell. A specific topic amongst others is the installation of the new Paul Wurth BLT®GEN3 gear box to optimize the charging process and fuel consumption. Finally, the successful blow-in results are shown.
Palavras-chave
Blast furnace reline; Campaign life; Rogesa; PW BLT®GEN3 Gear
Blast furnace reline; Campaign life; Rogesa; PW BLT®GEN3 Gear
Como citar
Hartig, Walter;
Labar, Dany;
Reufer, Franz.
2nd RELINE OF ROGESA’S BLAST FURNACE NO. 5 IN DILLINGEN/SAAR, GERMANY
,
p. 281-292.
In: 41º Ironmaking and Raw Materials Seminar and 12º Brazilian Symposium on Iron Ore,
Vila Velha,
2011.
ISSN: 2594-357X
, DOI 10.5151/2594-357X-20345