Anais dos Seminário de Energia, Utilidades e Gases Industriais


ISSN 2594-3626

Título

ANALISE DE VIABILIDADE ECONÔMICA DO INVESTIMENTO EM TURBINAS DE TOPO EM ALTOS FORNOS, CONSIDERANDO O MERCADO DE ENERGIA LIVRE E DE CRÉDITO DE CARBONO

FEASIBILITY OF NEW TRTS IN CST CONSIDERING THE FREE ENERGY MARKET AND CARBON CREDIT

DOI

10.5151/2594-3626-0002

Downloads

Baixar Artigo 75 Downloads

Resumo

A Companhia Siderúrgica de Tubarão - CST, usina integrada, localizada em Vitória, ES – Brasil, está incorporando novos equipamentos ao seu processo produtivo além de equipamentos auxiliares. Atualmente a CST opera com dois altos-fornos, com capacidade para 5,0 Mt/ano de gusa, alimentando uma aciaria com dois convertedores e duas máquinas de lingotamento contínuo. A nova configuração de equipamentos permitirá elevar a produção de placas e bobinas da CST de 5,0 Mt/ano para 7,5 Mt/ano, permitindo a empresa recuperar o volume de 5,0 Mt/a placas destinado ao mercado, reduzido a partir de 2002 com a implantação do LTQ. Os novos equipamentos permitirão o maior enobrecimento do mix de produção e a redução dos custos de produção. Esse novo cenário produtivo da CST e sua inserção no Grupo Arcelor, as alterações no modelo de mercado livre de energia elétrica brasileiro, e as possibilidades do Crédito de Carbono nos motivou a reavaliar a viabilidade econômica do projeto de recuperação de energia normalmente perdida dos topos dos Altos Fornos #2 (existente) e #3 (em construção), através de investimento na implantação de Turbinas de Topo (TRT), com geração total de aproximadamente 16 MW de energia limpa. O resultado desse estudo mostra alternativas viáveis de implantação e consequentes ganhos reais para todo o Grupo Arcelor, classificando tal projeto como de eficiência energética.

 

The Companhia Siderúrgica de Tubarão - CST, an integrated steelmaking company, located in Vitória, ES – Brazil, is adding new equipments to its process. In the present days CST is operating with 2 Blast Furnaces with capacity to produce 5.0 Mt/y of pig iron, feeding a Steelmaking Plant with 2 converters and 2 Continuous Casting Machines. The new equipments configuration will allow to increase the slabs production to 7.5 Mt/a, in order to recover the volume of 5.0 Mt/y of slabs to the market, decreased after the HSM start up in 2002. The new equipment will allow the ennoblement of the production mix and the reduction of the production cost. This new production scenario, the participation of CST in Arcelor Group, the changes in the new Brazilian free energy market and the possibilities brought by the carbon credit, motivated us to reevaluate the feasibility study of the Top Recovery Turbine (TRT) investment, to be installed on our Blast Furnaces 2 and 3, generating about 16 MW of clean electric energy, only getting advantage from a mechanical energy normally wasted. The result of this report presents feasible alternatives for the Top Recovery Turbines (TRTs) investments with advantages for all Arcelor Group, classifying this project as energy efficiency one.

Palavras-chave

Grupo Arcelor; TRT; Crédito de carbono; Mercado livre de energia

CST; TRT; Carbon credit; Free energy market

Como citar

Borges, Cristiana Gonçalves; Gomes, Dilson; Abreu, Guilherme Correa; Silva, Helder Vieira da; Endlich, Wanderson Luiz. ANALISE DE VIABILIDADE ECONÔMICA DO INVESTIMENTO EM TURBINAS DE TOPO EM ALTOS FORNOS, CONSIDERANDO O MERCADO DE ENERGIA LIVRE E DE CRÉDITO DE CARBONO , p. 12-20. In: 27º Seminário de Balanços Energéticos Globais e Utilidades e 21º Produtores e Consumidores de Gases Industriais, Porto Alegre, 2006.