BLAST FURNACE OFF GAS SYSTEM INTEGRITY ASSESSMENT AND CAMPAIGN LIFE EXTENSION

BLAST FURNACE OFF GAS SYSTEM INTEGRITY ASSESSMENT AND CAMPAIGN LIFE EXTENSION

DOI

10.5151/2594-357X-35076

Downloads

Baixar Artigo 35 Downloads

Resumo

GERDAU’S BLAST FURNACE #1 OFF-GAS SYSTEM HAS EXPERIENCED CHALLENGES INCLUDING HIGH METAL LOSS, SIGNIFICANT BUILD-UP OF DUST CAUSED BY PROCESS ISSUES, AND LOCAL BUCKLING DAMAGE CAUSED BY HIGH TEMPERATURE EVENTS, DURING MORE THAN 30 YEARS OF OPERATION. FITNESS-FOR-SERVICE ASSESSMENT WAS PERFORMED TO DEVELOP MITIGATION STRATEGIES INCLUDING SHORT-TERM LOCAL REPAIRS THAT COULD BE DONE WITHOUT INTERRUPTING PRODUCTION, AS WELL AS LONG-TERM REPAIRS TO EXTEND THE CAMPAIGN LIFE TO THE NEXT PLANNED MAJOR MAINTENANCE SHUTDOWN. THESE STRATEGIES ARE PRESENTED IN THIS PAPER, AND INCLUDE INSTALLING EXTERNAL REINFORCEMENT AND REFRACTORY LINING, IMPLEMENTING OPERATIONAL CONTROLS, AND FOLLOWING A HEALTH MONITORING PLAN. REPAIRS WERE SUCCESSFULLY PERFORMED, AND THE OFF GAS SYSTEM WAS ABLE TO CONTINUE OPERATION, RESULTING IN MAJOR FINANCIAL BENEFITS AND IMPROVED SAFETY CONDITIONS

 

GERDAU’S BLAST FURNACE #1 OFF-GAS SYSTEM HAS EXPERIENCED CHALLENGES INCLUDING HIGH METAL LOSS, SIGNIFICANT BUILD-UP OF DUST CAUSED BY PROCESS ISSUES, AND LOCAL BUCKLING DAMAGE CAUSED BY HIGH TEMPERATURE EVENTS, DURING MORE THAN 30 YEARS OF OPERATION. FITNESS-FOR-SERVICE ASSESSMENT WAS PERFORMED TO DEVELOP MITIGATION STRATEGIES INCLUDING SHORT-TERM LOCAL REPAIRS THAT COULD BE DONE WITHOUT INTERRUPTING PRODUCTION, AS WELL AS LONG-TERM REPAIRS TO EXTEND THE CAMPAIGN LIFE TO THE NEXT PLANNED MAJOR MAINTENANCE SHUTDOWN. THESE STRATEGIES ARE PRESENTED IN THIS PAPER, AND INCLUDE INSTALLING EXTERNAL REINFORCEMENT AND REFRACTORY LINING, IMPLEMENTING OPERATIONAL CONTROLS, AND FOLLOWING A HEALTH MONITORING PLAN. REPAIRS WERE SUCCESSFULLY PERFORMED, AND THE OFF GAS SYSTEM WAS ABLE TO CONTINUE OPERATION, RESULTING IN MAJOR FINANCIAL BENEFITS AND IMPROVED SAFETY CONDITIONS

Palavras-chave

Blast Furnace; Downcomer; Fitness-for-Service; Campaign Life Extension

Blast Furnace; Downcomer; Fitness-for-Service; Campaign Life Extension