ELIMINAR GOLPE DE ARÍETE NA REDE DE DISTRIBUIÇÃO DE ÁGUA INDUSTRIAL DA ACESITA

ELIMINATING WATER HAMMER IN ACESITA’S INDUSTRIAL WATER DISTRIBUTION NETWORK

DOI

10.5151/2594-5327-0199

Downloads

Baixar Artigo 49 Downloads

Resumo

A rede de água clarificada da Acesita S.A, apresentou 4 (quatro) grandes rompimentos, sendo 3 (três) deles em menos de 30 dias. Com base na planilha de Gerenciamento de Risco Operacional (GRO) apresentou um impacto econômico, de R$ 4.531.057,00. Diante destas ocorrências foram posicionados pontos de monitoramento da pressão na malha de distribuição de água e feito testes de simultaneidade na abertura e fechamento de válvulas de reposição das torres de refrigeração e reposição do tanque da descarepação da LTQ. Paralelamente, foi realizada uma inspeção geral na rede para detectar pontos potenciais de rompimento. Verificou-se a ocorrência de golpes de Aríete no sistema, isto é, ondas de contrapressão geradas pelo fechamento abrupto das válvulas, mediu-se a intensidade destes golpes isoladamente, registrando sua influência nos demais pontos de monitoramento preestabelecidos. Adotando esta metodologia, foi possível detectar que as válvulas de reposição de água estavam com tempo de fechamento muito rápido, provocando golpe de Aríete na rede, ocorrendo pressões elevadas na ordem de 17kgf/cm2 em trechos críticos, estes elevados picos de pressões foram identificados como a causa fundamental dos sucessivos rompimentos da rede de água neste curto espaço de tempo. As ações realizadas foram efetivas, cujo resultado pode ser visto por meio da inexistência de ocorrência de novos rompimentos da rede desde Fevereiro de 2003 até a presente data. Atualmente os níveis de pressão da rede de água clarificada da usina, são monitoradas on-line via supervisório da sala de controle do centro de energia.

 

Acesita S.A’s clarifying water network presented 4 (four) major disruptions, with 3 (three) of them occurring in less than 30 days. Based on the Management of Operational Risk (GRO) spreadsheet, they presented an economic impact totaling R$ 4,531,057.00. In response to these occurrences, pressure monitoring points were set up on the water distribution network and testes were carried out performing simultaneous opening and closing of the make-up valves from the cooling towers and make-up of LTQ descaling tank. At the same time, a general inspection was done to the network in order detect potential disruption points. Occurrence of water hammer was verified in the system, that is, contra-pressure waves generated by abrupt closing of valves. Then, the intensity of the blows was measured separately, with record of their influence on the other preset monitoring points. By adopting this methodology, it was possible to detect that the water make-up valves had a very small closing time (closing too fast), leading to water hammer in the network, with occurrence of high pressures to the order of 17kgf/cm2 in critical sections. These high pressures peaks were identified as the basic cause of the successive network pipe bursting in that short time period. The actions implemented were effective and their results can be seen by the inexistence of burst pipe occurrences in the network from February 2003 until the present date. At current, pressure levels in the clarified water network of the plant are being monitored on-line by means of a supervisory system from Power Management Center control room.

Palavras-chave

Golpe de aríete; Rede de água; Pressão.

Water hammer; Water network; Pressure.

Como citar

Alves, Péricles da Silva; Pessoa, Isac Quintão; Oliveira, Vagner Ferreira de; Oliveira, Ronei soares de; Carlos, Reginaldo Frinhani; Moreira, Paulo Assis; Marciano, Geraldo Leite; Metzker, Carlos Magno; Marques, José João; Coura, Marco Antônio Fraga; Pinto, Elpídio Jose Guerra; Claudino, Elson; Gouvea, Alexandre Miranda; Assis, Sérgio Barros de. ELIMINAR GOLPE DE ARÍETE NA REDE DE DISTRIBUIÇÃO DE ÁGUA INDUSTRIAL DA ACESITA , p. 1826-1836. In: 62º Congresso anual da ABM, Vitória, 2007.