Anais dos Seminários de Redução, Minério de Ferro e Aglomeração


ISSN 2594-357X

Título

ESTUDO DE DIAGNÓSTICO E PROLONGAMENTO DA CAMPANHA DOS REGENERADORES DO ALTO FORNO # 2 DA CSN

DIAGNOSTIC STUDY AND CAMPAIGN LIFE EXTENTION OF COMPANHIA SIDERÚRGICA NACIONAL (CSN) # 2 BLAST FURNACE HOT BLAST STOVES

DOI

10.5151/2594-357x-0108

Downloads

Baixar Artigo 82 Downloads

Resumo

Em 2000, a CSN e a DME realizaram um estudo de diagnóstico dos Regeneradores # 1, 2 e 3 do Alto Forno # 2, após 19 anos em operação e próximos ao encerramento da campanha de projeto - prevista para 20 anos, visando à subsidiar o prolongamento da campanha e o planejamento da reforma geral desses equipamentos. À luz do referido estudo de diagnóstico e do estudo “post mortem” do revestimento da Câmara de Empilhamento do Regenerador # 3, realizado em 2002, foram introduzidas novas técnicas de inspeção e de manutenção refratária – solda cerâmica, termografia, endoscopia e utilização de queimadores auxiliares durante paradas de longa duração. Modificações do projeto de revestimento também foram implantadas durante a reforma geral dos equipamentos. Como resultado final, considerando-se apenas os ganhos financeiros decorrentes do adiamento do investimento para a reforma geral – prolongamento da campanha, houve uma economia da ordem de R$ 14 milhões.

 

Back in 2000, CSN along with DME, conducted a diagnostic study on Hot Blast Stoves # 1, 2 and 3 of Blast Furnace # 2, after 19 years of operation and close to the end of its design campaign – originally set to last for 20 years. The primary purpose of this study was to support the Company’s efforts geared toward extending service life as well as paving the way for the general overhaul of such equipment. In light of this study and the post mortem study conducted in 2002 on Hot Blast Stove # 3 Checker Chamber lining, fresh inspection and refractory maintenance techniques were implemented, such as ceramic welding, thermography, endoscopy and use of auxiliary burners during lengthy shutdowns. Changes to lining design were also introduced during the general overhaul. If one just looks at the financial gains resulting from deferring capital expenditure for the general overhaul – extending the campaign, savings to the tune of R$ 14 million were ultimately attained.

Palavras-chave

Alto forno; Regenerador; Refratários.

Blast furnace; Hot blast stove; Refractory.

Como citar

Silva, Sidiney Nascimento; Marques, Oscar Rosa; Barbosa, Giancarlo Sterhling; Junior, Fernando Vernilli; Longo, Elson. ESTUDO DE DIAGNÓSTICO E PROLONGAMENTO DA CAMPANHA DOS REGENERADORES DO ALTO FORNO # 2 DA CSN , p. 1076-1086. In: 38º Seminário de Redução de Minério de Ferro e Matérias-primas e 9º Simpósio Brasileiro de Minério de Ferro, São Luís - MA, 2008.
ISSN: 2594-357X , DOI 10.5151/2594-357x-0108