Anais de Manutenção e Engenharia de Projetos em Metalurgia e Mineração


ISSN -

Título

INTEGRAÇÃO DAS METODOLOGIAS BUILDING INFORMATION MODELING E ADVANCED WORK PACKAGING PARA O ARMAZENAMENTO DE MATERIAIS: ESTUDO DE CASO MÁQUINA DE PÁTIO*

INTEGRATION OF BUILDING INFORMATION MODELING AND ADVANCED WORK PACKAGING METHODOLOGIES FOR MATERIAL MANAGEMENT: CASE STUDY OF BUCKET WHELL RECLAIMER

DOI

10.5151/2594-5327-41360

Downloads

Baixar Artigo 1 Downloads

Resumo

O PROJETO DA MáQUINA DE PáTIO ENVOLVE A SUBSTITUIçãO DE DUAS RETOMADORAS NO PáTIO DE CARREGAMENTO DA MINA DE CONCEIçãO. DADA A IMPORTâNCIA DESTE EQUIPAMENTO E DEVIDO à COMPLEXIDADE E AO PESO DOS COMPONENTES, FORAM REALIZADOS ESTUDOS PARA MELHORAR A LOGíSTICA DE MOVIMENTAçãO E ESTOCAGEM DAS PEçAS DE MONTAGEM. DESSA FORMA, PARA GARANTIR A DISPONIBILIDADE OPORTUNA DOS MATERIAIS, FOI IMPLEMENTADA A INTEGRAçãO DAS METODOLOGIAS BUILDING INFORMATION MODELING (BIM) E ADVANCED WORK PACKAGING (AWP) NA GESTãO DO ARMAZENAMENTO. O OBJETIVO PRINCIPAL FOI APRIMORAR O FLUXO DE TRABALHO LOGíSTICO, SEPARANDO AS PEçAS CONFORME OS PACOTES DE TRABALHO (CWP'S) E O SEQUENCIAMENTO CONSTRUTIVO PROPOSTO PELO BIM 4D. ISSO VISA REDUZIR MANUSEIOS DESNECESSáRIOS, MINIMIZAR OPERAçõES DE IçAMENTO DE CARGAS CRíTICAS E GARANTIR UM ARMAZENAMENTO SEGURO. ESTA ABORDAGEM CONTRIBUI PARA A REDUçãO DE INCIDENTES E MELHORIA DA SEGURANçA NO ARMAZéM. A INTEGRAçãO DESTAS DUAS METODOLOGIAS DEMONSTROU SER EFICAZ PARA AS COMPLEXIDADES LOGíSTICAS E OPERACIONAIS ENVOLVENDO O PROJETO, PROMOVENDO EFICIêNCIA, SEGURANçA E QUALIDADE DESTA ETAPA.

 

THE BUCKET WHELL RECLAIMER PROJECT INVOLVES THE REPLACEMENT OF TWO RECLAIMERS IN THE MINING AREA OF THE CONCEIçãO MINE. GIVEN THE IMPORTANCE OF THIS EQUIPMENT AND THE COMPLEXITY AND WEIGHT OF THE COMPONENTS, STUDIES WERE CONDUCTED TO IMPROVE THE LOGISTICS OF HANDLING AND STORING THE ASSEMBLY PARTS. TO ENSURE THE TIMELY AVAILABILITY OF MATERIALS, THE INTEGRATION OF BUILDING INFORMATION MODELING (BIM) AND ADVANCED WORK PACKAGING (AWP) METHODOLOGIES WAS IMPLEMENTED IN THE MATERIAL MANAGEMENT. THE MAIN OBJECTIVE WAS TO ENHANCE THE LOGISTICAL WORKFLOW BY SEPARATING THE PARTS ACCORDING TO WORK PACKAGES (CWPS) AND THE CONSTRUCTION SEQUENCING PROPOSED BY BIM 4D. THIS AIMS TO REDUCE UNNECESSARY HANDLING, MINIMIZE CRITICAL RIGGING OPERATIONS, AND ENSURE SAFE IN STORAGE. THIS APPROACH CONTRIBUTES TO REDUCING INCIDENTS AND IMPROVING WAREHOUSE SAFETY. THE INTEGRATION OF THESE TWO METHODOLOGIES PROVED EFFECTIVE FOR THE LOGISTICAL AND OPERATIONAL COMPLEXITIES INVOLVED IN THE PROJECT, PROMOTING EFFICIENCY, SAFETY, AND QUALITY IN THIS PHASE.

Palavras-chave

Building Information Modeling; Advanced Work Packaging; Armazém; Integração.

Building Information Modeling; Advanced Work Packaging; Storage; Integration.

Como citar

RIBEIRO, ELIZA DE ASSIS; SILVA, JOÃO PAULO DE SOUZA; RODRIGUES, FELIPE PATUSCO; MOR, MARCELO MORAES BARROS LEITE; ALVES, DIEGO HENRIQUE TRIGUEIRO; BOTELHO, WALLACE GONÇALVES. INTEGRAÇÃO DAS METODOLOGIAS BUILDING INFORMATION MODELING E ADVANCED WORK PACKAGING PARA O ARMAZENAMENTO DE MATERIAIS: ESTUDO DE CASO MÁQUINA DE PÁTIO* , p. 325-335. In: 1º Seminário de Manutenção e Engenharia de Projetos em Metalurgia e Mineração, São Paulo, Brasil, 2024.
ISSN: - , DOI 10.5151/2594-5327-41360