Anais do Seminário de Aciaria, Fundição e Metalurgia de Não-ferrosos


ISSN 2594-5300

47th Steelmaking Seminar - International vol. 47, num.47 (2016)


Título

LADLE MANAGEMENT SYSTEM

DOI

10.5151/1982-9345-27618

Downloads

Baixar Artigo 2894 Downloads

Resumo

Delivering liquid steel to a steel processing unit at right temperature is an important criterion for high production steel shops, but it is surprising how little attention has been paid in the past to manage this vital phase in the steelmaking process-the steel in transit. The ladle running costs, both directly and indirectly, contribute significantly to the cost of steelmaking and should be an area of concern to any high production steel plant. Here we are talking not only of refractory costs or preheating fuel costs, but also cost of extra heating in ladle furnace, additional process delays incurred in delivering steel at right temperature to downstream unit in case proper care is not exercised at upstream unit, and occasional costs of ladle breakout due to inability to judge the residual life of the ladle. This paper emphasizes the need of a comprehensive ladle management system, an aspect which has not been properly addressed in the operations of a steel plant, in improving the productivity of a steel melt shop. Starting with review of present status and the attempts at implementation of ladle tracking in steel melt shop automation system, it looks at components of an exhaustive Ladle Management System (LMS), and finally gives an idea of benefits that will accrue from implementation of such a system in a steel melt shop.

 

Palavras-chave

Ladle tracking, Relining, Temperature tracking, Ladle

Ladle

Como citar

Thomasberger, Jörg. LADLE MANAGEMENT SYSTEM , p. 163-168. In: 47th Steelmaking Seminar - International, Rio de Janeiro, 2016.
ISSN: 2594-5300 , DOI 10.5151/1982-9345-27618