Anais dos Seminários de Redução, Minério de Ferro e Aglomeração


ISSN 2594-357X

Título

MITIGATION CAPACITY RECOVERY OF DAMPING IN GELADINHO DAM TROUGHT OUT THE SEDIMENTARY ADVANTAGE LIKE IRON ORE PRODUCT

MITIGATION CAPACITY RECOVERY OF DAMPING IN GELADINHO DAM TROUGHT OUT THE SEDIMENTARY ADVANTAGE LIKE IRON ORE PRODUCT

DOI

10.5151/2594-357x-0031

Downloads

Baixar Artigo 38 Downloads

Resumo

The Geladinho is a sedimentary contention dam of iron ore Carajás plant since 1995. Just right the quantitity of material released in this contention, restricting the capacity of damping and being necessary prevention exits. After studies, were analysed two conditions for the probleam solution: the increase of dam slope or dredging. Dredging was chosen because of the lower enviromental impact and less time for implantation, being realized by pumping material to Gelado dam. Looking for another use to the material, drilling confirmed a viable economic quality, resulting in another study: the ore recuperation, bringing benefits as such a production increase, enviromental impact reduction and operacional costs, alsome avoid the Gelado dam acumulation. For this, two fronts of work are adopted with a exploration using cutter suction dredger downstream and backhole upstream, resulting in an annual production in order of 1.250.000 tonnes of iron ore.

 

The Geladinho is a sedimentary contention dam of iron ore Carajás plant since 1995. Just right the quantitity of material released in this contention, restricting the capacity of damping and being necessary prevention exits. After studies, were analysed two conditions for the probleam solution: the increase of dam slope or dredging. Dredging was chosen because of the lower enviromental impact and less time for implantation, being realized by pumping material to Gelado dam. Looking for another use to the material, drilling confirmed a viable economic quality, resulting in another study: the ore recuperation, bringing benefits as such a production increase, enviromental impact reduction and operacional costs, alsome avoid the Gelado dam acumulation. For this, two fronts of work are adopted with a exploration using cutter suction dredger downstream and backhole upstream, resulting in an annual production in order of 1.250.000 tonnes of iron ore.

Palavras-chave

Recovery; Dam; Dredging; Damping.

Recovery; Dam; Dredging; Damping.

Como citar

Oliveira, José Carlos de; Almeida, Marcelo Bustamante de; Patto, Francisco Rodrigues; Brandão, Tatiana Martins Machado; Junior, Raimundo Honório Queiroga; Crivella, Ernesto. MITIGATION CAPACITY RECOVERY OF DAMPING IN GELADINHO DAM TROUGHT OUT THE SEDIMENTARY ADVANTAGE LIKE IRON ORE PRODUCT , p. 299-304. In: 38º Seminário de Redução de Minério de Ferro e Matérias-primas e 9º Simpósio Brasileiro de Minério de Ferro, São Luís - MA, 2008.
ISSN: 2594-357X , DOI 10.5151/2594-357x-0031