A Companhia Siderúrgica de Tubarão - CST, uma usina integrada, localizada em Vitória, ES – Brasil, está incorporando novos equipamentos ao seu processo produtivo além de equipamentos auxiliares. Atualmente a CST opera com dois alto-fornos com capacidade para 5,0 Mt/ano de gusa, alimentando uma aciaria com dois convertedores e duas máquinas de lingotamento contínuo. Os convertedores produzem 5,1 Mt/ano de aço líquido destinadas ao lingotamento contínuo. A nova configuração de equipamentos permitirá elevar a produção de placas da CST de 5,0 Mt/ano para 7,5 Mt/ano, permitindo a empresa recuperar o volume de 5,0 Mt/a placas destinado ao mercado, reduzido a partir de 2002 com a implantação do LTQ. Os novos equipamentos permitirão o maior enobrecimento do mix de produção e redução dos custos de produção. Inicialmente, o modelo de simulação foi desenvolvido para analisar a capacidade de produção da nova aciaria, e estimar a carga de trabalho dos diversos equipamentos. Posteriormente o modelo foi aperfeiçoado para permitir testar vários cenários de produção e verificar com isto o efeito causado nos diversos equipamentos, desta forma é possível determinar a melhor prática operacional para a aciaria. A simulação fornece ainda uma excelente visão dos diversos problemas operacionais que poderão ocorrer, antes mesmo da nova configuração de equipamentos entrar em operação. Esse conhecimento prévio dos problemas permitiu a antecipação de soluções que certamente resultará em substancial redução de custos durante a fase de avaliação dos novos equipamentos.

 

The Companhia Siderúrgica de Tubarão - CST, an integrated steelmaking company, located in Vitória, ES – Brazil, is adding new equipment to its process. The start up of this phase will be in the second semester of 2006. In the present days CST is operating with 2 Blast Furnaces with the capacity of 5.0 Mt/y of pig iron, feeding a Steelmaking with 2 converters and 2 Continuous Casting Machines. The new equipment configuration will allow to increase the slabs production to 7.5 Mt/a, allowing the company recovery the volume of 5.0 Mt/y of slabs to the market, decreased after the 2002 with the HSM start up. The new equipment will allow the ennoblement of the production mix and the reduction of the production cost. Initially, a simulation model was developed to determine the Steel Plant capacity and to estimate the main equipment operational index. As a second step, the model was improved to allow tests considering different production scenarios, to show the effect in the equipment index and to determine the best operational model. The simulation provided an excellent understanding of the future operating process, allowing a previous vision of the potential bottlenecks and also to identify reduced costs practices before the new equipment start up. The model was developed using the ARENA-Release 8.01. It is helpful for the managers as a decision making tool.

Palavras-chave

Aciaria, Simulação, Arena, Maquina de lingotamento contínuo.

Steelmaking Shop, Simulation, Arena, Continuous Casting Machine