Título

PRODUCTIVITY INCREASE AT ARCELORMITTAL TUBARAO HOT STRIP MILL

DOI

10.5151/9785-9785-32205

Downloads

Baixar Artigo 461 Downloads

Resumo

 

ArcelorMittal Tubarão HSM productivity has increased gradually and consistently over the last four years, based on increasing charging temperature, furnace efficiency, decreasing Roughing mill and Finishing Mill cycle times and tuning models for Mill Pacing Control and Slab Design. This paper will show the path which was followed by TUBARÃO HSM team to achieve more than a 20% productivity increase resulting in a hot coils year production more than 700 kt higher.

Palavras-chave

Hot strip mill, Productivity

Como citar

Júnior, José Fagundes; Possatti, Juliano Braz; Moreira, Angelo Campos. PRODUCTIVITY INCREASE AT ARCELORMITTAL TUBARAO HOT STRIP MILL , p. 52-59. In: 11th International Rolling Conference (IRC 2019), São Paulo, 2019.
ISSN: - , DOI 10.5151/9785-9785-32205