Resumo

A eficiência operacional é um fator essencial para garantir a competitividade das empresas. O desafio é estudar os processos de forma a aumentar a sua produtividade sem necessidade de investimento, gerando valor as empresas. O equipamento estudado, a Linha de Inspeção é o gargalo na produção limitando a geração de produtos em volume ou qualidade. As etapas eleitas para estudo foram os setup’s das atividades de inicio (encaixe) e final (desencaixe) do processo, atividades não automatizadas, com maior intervenção humana que sofrem interferência direta dos tempos e métodos praticados pelos operadores. Utilizando o método dedutivo, tendo como ferramenta de apoio, a pesquisa bibliográfica para fundamentação teórica e realizadas observações de campo, determinou-se os melhores tempos para realização das atividades visando a sua otimização. O presente trabalho tem como objetivo modificar o método operacional nesta Linha de Inspeção visando o aumento da eficiência produtiva, aumentando a geração dos laminados à frio. O trabalho comprovou que a mudança do modo operacional proporciona um incremento de 8% na produção (1.800t/mes).

 

Operational efficiency is a key factor to ensure the competitiveness of enterprises. The challenge is to study the process in order to increase its productivity without investment value generating companies. The equipment studied, the inspection line is the production bottleneck limiting the generation of product by volume or quality. s. The steps were elected to study the set-up's of start (threating) and final (realease) of the process, not automated activities, more human intervention that suffer direct interference of the times and methods practiced by operators. Using the deductive method, and as a support tool, the literature for theoretical foundation and conducted field observations, it was determined the best times for carrying out activities aimed at optimization. This work aims to modify the operating method in this inspection line in order to increase production efficiency, increasing the generation of the cold rolled. The work proved that the operating mode change provides an increase of 8% in production (1,800t / month)

Palavras-chave

Tempos padrões, Redução dos tempos de Set up, Produtividade