ISSN -
11th International Rolling Conference (IRC 2019) — vol. 11, num.11 (2019)
Título
Autoria
DOI
Downloads
Resumo
This article deals with a project to reduce the preparation time and threading the coils in the input section of a pickling line coupled to the cold strip mill (PLTCM) at ArcelorMittal Vega. The project developed serves for the detection and elimination of bottlenecks in the input section. The project was conceived by the philosophy of the Theory of Constraints (TOC) and Lean Six Sigma (6 sigma), here seen as sequencing serial / parallel in the preparation and threading the coils. In this context, a proposal to modify the automatic sequencing and reduction of interruptions due to failure of the automation / equipment confirmed its effectiveness reducing the total time preparation time and threading the coils in the entry section by 15%. This project was developed without investment costs, bringing gains on the order of US$613,769.00.
Palavras-chave
Bottleneck; Preparation and threading coil, setup in continuous processes; Lean Six Sigma.
Como citar
Félix, Glaudistoni da Silva;
Luiz, Michel Rodrigo;
Junior, Osmar Duarte;
Melo, Leonardo Souza de.
REDUCED PREPARATION TIME AND THREADING THE COILS IN THE ENTRY SECTION PLTCM
,
p. 422-427.
In: 11th International Rolling Conference (IRC 2019),
São Paulo,
2019.
ISSN: -
, DOI 10.5151/9785-9785-32295