Anais de Manutenção e Engenharia de Projetos em Metalurgia e Mineração


ISSN -

Título

REPARO A FRIO DO ALTO-FORNO #2 CSN SEM CORRIDA DA SALAMANDRA

COLD REPAIR OF BLAST FURNACE 2 CSN WITHOUT SALAMANDER TAP

DOI

10.5151/2594-5327-41130

Downloads

Baixar Artigo 1 Downloads

Resumo

O ALTO-FORNO 2 CSN TEVE INíCIO DA SUA QUINTA CAMPANHA REFRATáRIA EM 1991, DESDE ENTãO é O FORNO RECORDISTA MUNDIAL EM OPERAçãO DENTRO DE UMA úNICA CAMPANHA DO CADINHO. DEVIDO A NECESSIDADE DE POSTERGAçãO DA REALIZAçãO DO REPARO GERAL REFRATáRIO, A CSN DECIDIU INICIAR EM 2022 IMPLEMENTAR AçõES DE PROLONGAMENTO DA VIDA úTIL DO AF2, AçõES COMO INJEçãO DE MASSA NA REGIãO RAMPA, VENTRE E BAIXA CUBA, SHOTCRETE ROBOTIZADO PARA REGIõES DA COROA DE CHOQUE, ALTA E MéDIA CUBA E A ATIVIDADE DE REPARO A FRIO DE TODA PAREDE REFRATáRIA DO CORPO, SEM REALIZAR A CORRIDA DA SALAMANDRA. PARA ATIVIDADE A FRIO DENTRO DO AF FOI REALIZADA A CONFECçãO DE ROLHA REFRATáRIA ABAIXO DO NíVEL DAS VENTANEIRAS. AO TODO FORAM APLICADAS 413 TONELADAS DE CONCRETO REFRATáRIO VIA SHOTCRETE MANUAL E ROBOTIZADO, MAIS 37 TONELADAS DE TIJOLOS REFRATáRIOS A BASE DE CARBETO DE SILíCIO. TODAS AS ATIVIDADES FORAM REALIZADAS DENTRO DO PRAZO DE CRONOGRAMA DE 15 DIAS CORRIDOS, COM PARTICIPAçãO DE 700 COLABORADORES EM REGIME DE TURNO 12/12 HORAS.

 

CSN'S BLAST FURNACE 2 BEGAN ITS FIFTH REFRACTORY CAMPAIGN IN 1991, AND SINCE THEN IT HAS BEEN THE WORLD'S RECORD-BREAKING FURNACE IN OPERATION WITHIN A SINGLE CAMPAIGN. DUE TO THE NEED TO POSTPONE THE GENERAL REFRACTORY REPAIR, CSN DECIDED TO START IMPLEMENTING ACTIONS TO EXTEND THE USEFUL LIFE OF BF2 IN 2022, ACTIONS SUCH AS MASS INJECTION IN THE BOSH, BELLY AND LOW STACK, ROBOTIC SHOTCRETE FOR THE THROAT ARMOUR, UP AND MEDIUM STACK AND THE COLD REPAIR ACTIVITY OF THE ENTIRE REFRACTORY WALL, WITHOUT SALAMANDER TAP. FOR COLD REPAIR INSIDE THE BF, A REFRACTORY CAP WAS MADE BELOW THE LEVEL OF THE TUYERES. A TOTAL OF 413 TONS OF REFRACTORY CASTABLE WERE APPLIED VIA MANUAL AND ROBOTIZED SHOTCRETE, PLUS 37 TONS OF SILICON CARBIDE REFRACTORY BRICKS. ALL THE ACTIVITIES WERE CARRIED OUT WITHIN THE SCHEDULE OF 15 CALENDAR DAYS, WITH THE PARTICIPATION OF 700 EMPLOYEES WORKING 12/12H

Palavras-chave

Alto-forno; CSN; Refratário; shotcrete

Bast furnace; CSN, Refractory, shotcrete.

Como citar

NASCIMENTO, LEOCIMAR ANDRADE; NASCIMENTO, LEOCIMAR ANDRADE. REPARO A FRIO DO ALTO-FORNO #2 CSN SEM CORRIDA DA SALAMANDRA , p. 249-259. In: 1º Seminário de Manutenção e Engenharia de Projetos em Metalurgia e Mineração, São Paulo, Brasil, 2024.
ISSN: - , DOI 10.5151/2594-5327-41130