Anais do Seminário de Laminação, Conformação de Metais e Produtos


ISSN 2594-5297

52º Seminário de Laminação vol. 52, num.52 (2015)


Título

SILAT SELECTS RUSSULA TO ENGINEER AND SUPPLY A 700,000 TPY STEEL PLANT

DOI

10.5151/1983-4764-27282

Downloads

Baixar Artigo 1033 Downloads

Resumo

Silat, Siderúrgica Latino-americana, selected Russula as the main engineering contractor for their 700,000 tpy Greenfield steel plant dedicated to long and flat steel production. The project is currently under construction in the district Guararu in Caucaia in the metropolitan region of Fortaleza. The project will be developed in two phases. First phase: 600,000 tons per year rebar mill and 60,000 tpy steel mesh line; Second phase: 700,000 tpy melt shop (90 ton/hr EAF and 4 strand continuous caster for billets up to 180 mm x 180 mm).

 

Palavras-chave

Silat, Siderúrgica latino-americana, Selected Russula as the main engineering contractor for their 700,000 tpy Greenfield steel plant

Selected Russula as the main engineering contractor for their 700,000 tpy Greenfield steel plant

Como citar

Schultz, Alexandre Rizek. SILAT SELECTS RUSSULA TO ENGINEER AND SUPPLY A 700,000 TPY STEEL PLANT , p. 581-588. In: 52º Seminário de Laminação, Rio de Janeiro, 2015.
ISSN: 2594-5297 , DOI 10.5151/1983-4764-27282