Anais dos Seminário de Energia, Utilidades e Gases Industriais


ISSN 2594-3626

Título

ADEQUAÇÃO DAS PRÁTICAS DE OPERAÇÃO E MANUTENÇÃO DE SITES INDUSTRIAIS AOS REQUISITOS DE SEGURANÇA DA NR-10: CASOS REAIS

SUITABILITY OF OPERATION AND MAINTENANCE PRACTICES OF INDUSTRIAL SITES TO SAFETY REQUIREMENTS OF NR-10: REAL CASES

DOI

10.5151/2594-3626-25652

Downloads

Baixar Artigo 767 Downloads

Resumo

Após 10 anos da aprovação da portaria 598 do Ministério do Trabalho, e ter realizado Laudo de Inspeção em mais de 60 sites industriais de grande porte, a PDCA Engenharia tem sido envolvida no processo de adequação do sistema de gestão de manutenção e operação das instalações elétricas de seus clientes. O relatório de inspeção preconizado no item 10.2.4.g da NR-10 estabelece a obrigatoriedade de se levantar os aspectos não conformes, estabelecer um plano de adequação definindo responsáveis e prazo de execução. Com os efetivos de manutenção reduzidos, nossos clientes passaram a envolver a PDCA na implementação das ações de adequação. Este trabalho consiste entre outras coisas na identificação das intervenções críticas de operação e manutenção das instalações elétricas (15 a 20 no máximo por site), analisá-las do ponto de vista dos riscos elétricos e adicionais associados a cada etapa de execução, estabelecer as medidas de controle necessárias para a mitigação destes riscos, redigir procedimentos e treinar o pessoal envolvido. Outros procedimentos devem trabalhar a eliminação dos riscos para os trabalhadores não autorizados (leigos), que interajam indiretamente em instalações elétricas e serviços com eletricidade. Apresentamos um resumo desta experiência recente com clientes da área Química/Petroquímica e da área de Logística.

 

Ten years after the adoption of Ordinance 598 of the Ministry of Labour , and have held Valuation Inspection in more than 60 industrial large sites , the PDCA Engineering became involved in the suitability of the maintenance management system and operation of power process facilities of their customers. The inspection report recommended of the item 10.2.4.g NR - 10 establishes the obligation to indicate the issues that DO NOT COMPLY, establish a fitness plan defining responsible and execution time. With the decreasing number of maintenance workers, our customers started share with PDCA the adequacy actions. The work consists, among other things, to identify the critical interventions to the operation and maintenance of electrical installations (15 to 20 at most), analyze them in terms of electrical hazards and additional risks associated with each intervention step, establish the necessary control measures to mitigate these risks, develop procedures and train the involved staff. Other procedures look for the elimination of risks for unauthorized workers (lays) that interact indirectly in electrical facilities and with any other work in electricity. We present a summary of recent experience with clients of Chemical / Petrochemical area and the Logistics area.

Palavras-chave

NR-10; Adequação; Procedimentos; Intervenções

NR-10; Suitability; Procedures; Interventions

Como citar

Francisco Vitor Vasques Barbosa; Luis Antonio Brito Leal. ADEQUAÇÃO DAS PRÁTICAS DE OPERAÇÃO E MANUTENÇÃO DE SITES INDUSTRIAIS AOS REQUISITOS DE SEGURANÇA DA NR-10: CASOS REAIS , p. 4435-4445. In: 35° Seminário de Balanços Energéticos Globais e Utilidades e 29° Encontro de Produtores e Consumidores de Gases Industriais, São Paulo - Brasil, 2014.
ISSN: 2594-3626 , DOI 10.5151/2594-3626-25652