At thyssenkruppCSA, a positive heat balance at BOF process is faced, mainly because of low utilization of scrap and plant design. A singular logistic concept for hot metal transport between blast furnace and steel plant was established to optimize transportation and energy balance. Up to 80 kg of iron ore pellets/t steel is necessary for 340t BOF heat balance. In order to accomplish this challenge a stable blowing process, intensive operational development have been successfully executed: slopping rate reduction of 80% achieved without changing the blowing time. This paper describes steps and results of this development.
Palavras-chave
BOF, LD converter, process, slopping, iron ore, addition, blowing process
BOF, LD converter, process, slopping, iron ore, addition, blowing process
Como citar
Carvalho, Daniel Augusto Godinho de;
Castro, Herbert;
Demuner, Leonardo;
Viana, Marcos;
Wojnar, Pavel;
Schulz, Tilo;
Maia, Breno Totti.
BOF BLOWING PROCESS CHALLENGES FOR HIGH RATE OF IRON ORE PELLET ADDITION - PROCESS DEVELOPMENT AND RESULTS AT TKCSA
,
p. 637-645.
In: 48º Seminário de Aciaria, Fundição e Metalurgia de Não-Ferrosos,
São Paulo,
2017.
ISSN: 2594-5300
, DOI 10.5151/1982-9345-30634