Título

OTIMIZAÇÃO DOS PARAMETROS ELETROQUÍMICOS DO FORNO ELÉTRICO A ARCO DA VSBM APÓS INSTALAÇÃO DO NOVO TRANSFORMADOR E NOVO SISTEMA DE INJEÇÃO DE GRAFITE

OPTIMIZATION OF ELECTROCHEMICAL PARAMETERS OF ELECTRIC ARC FURNACE AT VSBM AFTER THE INSTALLATION OF NEW TRANSFORMER AND NEW INJECTION SYSTEM GRAPHITE

DOI

10.5151/2594-5300-22828

Downloads

Baixar Artigo 524 Downloads

Resumo

Os desafios impostos pelos competidores globais exigem que a indústria brasileira seja altamente competitiva. Destacam-se alguns pontos importantes para que uma empresa tenha vantagem competitiva: cultura organizacional, história, instituições, estrutura econômica, infra-estrutura logística, regimes tributários, tecnologia, câmbio e principalmente práticas que levam a redução dos custos industriais, item qual este trabalho foi inserido. No final de novembro de 2011 a VS repotenciou um de seus fornos da planta de Barra Mansa trocando o transformador de 30/36 MVA por um de 40/48MVA e em meados de março instalou dois pontos de injeção de grafite pela carcaça, que até então era realizado pelo barrado. Com esses investimentos foram necessários realizar ajustes eletroquímicos no FEA de modo a aproveitar da melhor maneira possível todo aporte térmico inserido. Os principais resultados alcançados foram a redução do Power On de 25,6%, redução da energia elétrica; aumento da utilização; aumento de rendimento metálico, estabilização do consumo de refratário e principalmente aumento da produtividade, que evoluiu 35,4%.

 

The challenges delivered by global players require that the Brazilian industry be highly competitive. Some important points that are highlights of a company are: organizational culture, history, institutions, economic structure, logistics infrastructure, tax regimes, technology exchange and especially practices that lead to reduced manufacturing costs and is this last item that this work is inserted. In late November 2011, the Votorantim repowered one of his furnaces in Barra Mansa factory and change the transformer 30/36 MVA by one of 40/48MVA and installed in march 2012 two carbon injection points by the furnace wall, which until then was performed by slag door. With these investments were necessary make electrochemical adjustments on EAF in order to make the best possible heat input throughout inserted. The main results were the to reduce the Power On about 25,6%; increasing OEE, metallic yield, stabilization of refractory consumption and mainly productivity, which grew 35,4%.

Palavras-chave

Forno elétrico; Rendimento metálico; Produtividade.

Eletrical arc furnace; Metallic yield; Productivity.

Como citar

Júnior, Ely da Silva Araújo; Rocha, Cássio Roberto; Silva, Fernando Vital; Breda, Daniel Seixas; Almeida, Marco Antônio de; Mendonça, Alexandre Alves de. OTIMIZAÇÃO DOS PARAMETROS ELETROQUÍMICOS DO FORNO ELÉTRICO A ARCO DA VSBM APÓS INSTALAÇÃO DO NOVO TRANSFORMADOR E NOVO SISTEMA DE INJEÇÃO DE GRAFITE , p. 597-605. In: 44º Seminário de Aciaria, São Paulo, 2013.