THIS PAPER DISCUSSES THE LONG ON-GOING CAMPAIGN OF MORE THAN THIRTY YEARS OF BLAST FURNACE NO.6 (BF6) AT TATA STEEL’S IJMUIDEN SITE. DESIGN ASPECTS AND OPERATIONAL CONDITIONS ARE DESCRIBED, EXPLAINING HOW THIS EXCEPTIONALLY LONG CAMPAIGN COULD BE ACHIEVED.
THIS PAPER DISCUSSES THE LONG ON-GOING CAMPAIGN OF MORE THAN THIRTY YEARS OF BLAST FURNACE NO.6 (BF6) AT TATA STEEL’S IJMUIDEN SITE. DESIGN ASPECTS AND OPERATIONAL CONDITIONS ARE DESCRIBED, EXPLAINING HOW THIS EXCEPTIONALLY LONG CAMPAIGN COULD BE ACHIEVED.
Keywords
Blast Furnace Campaign Life; Asset Management; Bottom and Hearth; Bosh and Stack
Blast Furnace Campaign Life; Asset Management; Bottom and Hearth; Bosh and Stack
How to cite
Kerkhoven, Frank.
30+ YEAR CAMPAIGN OF IJMUIDEN BLAST FURNACE NO. 6,
p. 32-44.
In: 50th Ironmaking and Raw Materials Seminar,
São Paulo,
2022.