ATINGINDO MAIOR PRODUTIVIDADE NA PLANTA DE SÍNTER: UM ESTUDO DE CASO DA ARCELORMITTAL PECÉM

ACHIEVING GREATER PRODUTIVITY IN THE SINTER PLANT: A CASE STUDY OF ARCELORMITTAL PECÉM

DOI

10.5151/2594-357X-40883

Downloads

Abstract

O SíNTER PRODUTO é UMA DAS POSSíVEIS FONTES DE FERRO PARA A PRODUçãO DE FERRO GUSA EM ALTOS FORNOS, POSSUINDO CUSTO MAIS BAIXO QUANDO COMPARADO COM FONTES MAIS NOBRES COMO A PELOTA E O MINéRIO DE FERRO GRANULADO. DESSA FORMA, O AUMENTO DA PRODUTIVIDADE NA SINTERIZAçãO E, CONSEQUENTEMENTE, A MAIOR OFERTA DESSA MATéRIA-PRIMA POSSIBILITAM MAIOR CONSUMO DE SíNTER PRODUTO NO ALTO FORNO, REDUZINDO O CUSTO DE PRODUçãO DO FERRO GUSA. ATRAVéS DE MELHORIAS NO PROCESSO, NA QUALIDADE DAS MATéRIAS-PRIMAS E NA QUALIDADE DO SíNTER FOI POSSíVEL ELEVAR A PRODUTIVIDADE DA SINTERIZAçãO DA ARCELORMITTAL PECéM. BASEADO EM ESTUDOS BIBLIOGRáFICOS, NO KNOW HOW DA EQUIPE E DO ESTUDO DO HISTóRICO DE DESEMPENHO DA MáQUINA DE SíNTER DA ARCELORMITTAL PECéM AS AçõES FORAM PLANEJADAS E IMPLEMENTADAS NO PROCESSO. O IMPACTO DAS AçõES FOI POSITIVO, ELEVANDO A PRODUTIVIDADE ATé O OBJETIVADO COM ESTABILIDADE E POSSIBILITOU O INíCIO DE NOVOS PROJETOS COM O INTUITO DE ALCANçAR 36 T SINTER/M²/DIA.

 

SINTER IS ONE OF THE POSSIBLE IRON SOURCES FOR HOT METAL PRODUCTION IN BLAST FURNACES. IT HAS LOWER COST WHEN COMPARED WITH PELLET AND LUMP ORES. THEREBY, THE INCREASE OF PRODUCTIVITY IN SINTER PLANT AND, CONSEQUENTLY, THE LARGEST OFFER OF THIS RAW MATERIAL MAKE HIGHER SíNTER CONSUMPTION IN BLAST FURNACE POSSIBLE, REDUCING HOT METAL PRODUCTION COST. THROUGH PROCESS IMPROVEMENTS, AND THE QUALITY IN RAW MATERIAL AND IN SíNTER, THE INCREASE OF SíNTER PLANT PRODUCTIVITY WAS POSSIBLE AT ARCELORMITTAL PECéM. THE ACTIONS WERE PLANNED AND IMPLEMENTED ACCORDING TO BIBLIOGRAPHY STUDIES, TEAM KNOW HOW AND THE STUDY OF HISTORICAL PERFORMANCE OF ARCELORMITTAL PECéM SíNTER PLANT. THE IMPACT OF THIS ACTIONS WAS POSITIVE, WHICH INCREASED SíNTER PLANT PRODUCTIVITY UNTIL THE TARGET WITH PROCESS STABILITY AND IT MADE POSSIBLE START OF NEW PROJECTS TO REACH 36 T SíNTER/M²/DAY.

Keywords

Produtividade; Sinterização.

Productivity; Sinter plant.

How to refer

PONTE, MATHEUS SALMITO RODRIGUES; ONIAS, ANTONIO CARLOS DA COSTA; SILVA, EMERSON DE SOUZA; PAULINO, MATEUS ALVES SEGUNDO; FILHO, MIGUEL ARAÚJO DE VASCONCELOS; FINEZA, MICHAEL JEFERSON DE SOUZA. ATINGINDO MAIOR PRODUTIVIDADE NA PLANTA DE SÍNTER: UM ESTUDO DE CASO DA ARCELORMITTAL PECÉM , p. 127-139. In: 10º Seminário de Aglomeração de Minérios, São Paulo, Brasil, 2024.