UMA CONFIGURAçãO COMUM ENCONTRADA EM UMA ETAPA DE BRITAGEM PRIMáRIA é UM BRITADOR DE MANDíBULAS COMBINADO COM UMA GRELHA VIBRATóRIA E GERALMENTE SEM UMA MEDIçãO DIRETA DO QUE ESTá SENDO ALIMENTADO NO BRITADOR, EM TERMOS DE TAXA DE ALIMENTAçãO OU GRANULOMETRIA. DIANTE DISSO, PROBLEMAS COM SOBRECARGAS E OBSTRUçõES SãO FREQUENTEMENTE ENCONTRADOS, CAUSANDO PARADAS OPERACIONAIS E REDUçãO DA PRODUTIVIDADE. ESTE ARTIGO DESCREVE O DESENVOLVIMENTO DE UMA ESTRATéGIA DE CONTROLE, APLICADA EM UMA PLANTA DE MINéRIO DE FERRO DA VALE, CAPAZ DE REGULAR O PROCESSO DIANTE DE VIOLAçõES DE CAPACIDADE DO BRITADOR DE MANDíBULAS, CAUSADAS POR UMA TAXA DE ALIMENTAçãO ACIMA DO LIMITE OU MATERIAL SUPERDIMENSIONADO. A VARIáVEL DE PROCESSO UTILIZADA FOI A CORRENTE ELéTRICA DO MOTOR DO BRITADOR, QUE é UMA MEDIçãO CONFIáVEL, COM ALTA DISPONIBILIDADE E REQUER PEQUENOS ESFORçOS DE MANUTENçãO, AO CONTRáRIO DE OUTRAS OPçõES DE INSTRUMENTAçãO. OS RESULTADOS INDICAM UM AUMENTO NAS HORAS DE OPERAçãO ENTRE PARADAS DE 2,81 HORAS E UMA REDUçãO DE 9,8 PONTOS PERCENTUAIS NA RAZãO DE HORAS INDISPONíVEIS POR HORAS DE OPERAçãO. ALéM DISSO, HOUVE UM AUMENTO DE 9,0% NA VAZãO MáSSICA MéDIA DURANTE OS PERíODOS DE RESTRIçãO POR BLOCOS.
A COMMON LAYOUT FOUND IN A PRIMARY CRUSHING STAGE IS A JAW CRUSHER COMBINED WITH VIBRATING GRIZZLY FEEDER, USUALLY WITHOUT DIRECT MEASUREMENT OF WHAT IS BEING FED INTO THE CRUSHER, IN TERMS OF FEED RATE OR PARTICLE SIZE DISTRIBUTION. CONSIDERING THIS, PROBLEMS WITH JAW CRUSHERS OVERLOADS AND OBSTRUCTIONS ARE FREQUENTLY ENCOUNTERED, CAUSING OPERATIONAL STOPS AND PRODUCTIVITY REDUCTION. THIS PAPER DESCRIBES THE DEVELOPMENT OF A CONTROL STRATEGY, APPLIED IN A VALE’S IRON ORE PLANT, CAPABLE OF REGULATING THE PROCESS IN FACE OF JAW CRUSHER CAPACITY VIOLATIONS CAUSED BY AN OVERLIMIT FEED RATE OR AN OVERDIMENSIONED MATERIAL. THE CONTROLLER PROCESS VARIABLE USED WAS AN ALREADY EXISTENT CRUSHER MOTOR CURRENT, WHICH IS A RELIABLE MEASUREMENT, WITH HIGH AVAILABILITY AND REQUIRES SMALL MAINTENANCE EFFORTS UNLIKE OTHER INSTRUMENTATION OPTIONS. THE RESULTS INDICATE AN INCREASE IN OPERATING HOURS BETWEEN STOPS OF 2.81 HOURS AND A REDUCTION OF 9.8 PERCENTAGE POINTS IN THE RATIO OF UNAVAILABLE HOURS PER OPERATING HOURS. FURTHERMORE, THERE WAS A 9.0% INCREASE IN THE AVERAGE MASS FLOW RATE DURING THE BLOCK RESTRICTION PERIODS.
Keywords
Britador de mandíbulas; Controle de processos; Material superdimensionado; Sobrecarga de britadores
Jaw crusher; Process Control; Over dimensioned material; Crusher overload.
How to refer
ALBUQUERQUE, KAIKE SILVA;
DUARTE, ROBSON APARECIDO;
FONSECA, ALEXANDRE GOMES;
SILVA, ARLEY ATHOS PEREIRA.
AUMENTO DE DESEMPENHO OPERACIONAL ATRAVÉS DE CONTROLE DE CORRENTE DE BRITADOR DE MANDÍBULAS
,
p. 598-607.
In: 23º Seminário de Mineração,
São Paulo, Brasil,
2024.
ISSN: 2594-357X
, DOI 10.5151/2594-357X-41225