ISSN 2594-5297
49º Seminário de Laminação — vol. 49, num.49 (2012)
Title
Authorship
DOI
Downloads
Abstract
Project implemented with the aim of reducing the material waste in the mill, and consequently increase process efficiency by implementing an innovative system of automatic stop at the end of lamination with precision. Statistical tools were used through the Minitab software and analysis and simulation through the iba Analyzer to develop a robust and able to reduce the average error in the crown of material discarded from 6.09 mm to -0.71 mm with a standard deviation above of 8.55 mm to 3.05 mm, which allowed the reduction of waste material and provided an immediate improvement in the efficiency of Can Body Stock at 1% and 1.5% gain in Can End Stock.
Projeto executado com o intuito de reduzir as sobras de material nos laminadores e consequentemente aumentando a eficiência no processo através da implementação de um sistema inovador de parada automática no final da laminação com precisão. Foram utilizados ferramentas estatísticas através do software MiniTab e de análise e simulação através do iba Analyzer para se desenvolver um sistema robusto e conseguir a redução do erro médio da coroa do material descartado de 6,09 mm para -0,71 mm com desvio padrão anterior de 8,55 mm para 3,05 mm, o que possibilitou a redução de material descartado e proporcionou uma melhoria imediata na eficiência do Can Body Stock em 1%, e ganho de 1,5% no Can End Stock.
Keywords
Eficiência; Descarte; ASD; Automação.
Efficiency; Discard; ASD; Automation
How to refer
Brandão, Gustavo de Alvarenga;
Majuste., Ronilson.
AUMENTO DE EFICIÊNCIA ATRAVÉS DA
IMPLEMENTAÇÃO DE UM NOVO SISTEMA AUTOMATIC
SLOW DOWN (ASD) PARA REDUÇÃO DE DESCARTE
,
p. 396-404.
In: 49º Seminário de Laminação,
Rio de Jabeiro,
2012.
ISSN: 2594-5297
, DOI 10.5151/2594-5297-22579