Abstract

O CENTRO DE USINAGEM É UM EQUIPAMENTO QUE, ALÉM DE CONFORMAR MATERIAIS SÓLIDOS TAMBÉM GERA O ACABAMENTO DE PEÇAS, SENDO ESSENCIAL PARA INDÚSTRIAS QUE BUSCAM GANHO DE PRODUTIVIDADE. O LABORATÓRIO DE TESTE MECÂNICO DA ARCELORMITTAL TUBARÃO PRODUZ CORPOS DE PROVA E REALIZA ENSAIOS MECÂNICOS EM CHAPAS DE AÇO, TAIS COMO TRAÇÃO E IMPACTO CHARPY. NO LABORATÓRIO FOI INSTALADO UM NOVO CENTRO DE USINAGEM COM SISTEMA DE FIXAÇÃO DESENVOLVIDO PARA AUMENTAR A PRODUTIVIDADE NA PREPARAÇÃO DE CORPOS DE PROVA. O OBJETIVO DESTE TRABALHO É AVALIAR O AUMENTO DE PRODUTIVIDADE DESSE NOVO EQUIPAMENTO, VISANDO OTIMIZAR A PRODUÇÃO DE AMOSTRAS DE AÇO. NA NOVA CONDIÇÃO FOI OBSERVADO UM AUMENTO DO TEMPO DE USINAGEM PARA CP DE TRAÇÃO, PORÉM COM UMA MAIOR QUANTIDADE DE CORPOS DE PROVA. NOS CP DE ENSAIO DE CHARPY, FICOU EVIDENCIADO UMA REDUÇÃO SUBSTANCIAL NO TEMPO DE PREPARAÇÃO, ALÉM DE SER UTILIZADO UM ÚNICO EQUIPAMENTO PARA TAL.

 

THE MACHINING CENTER IS A PIECE OF EQUIPMENT THAT, BESIDES FORMING SOLID MATERIALS, ALSO PRODUCES THE COMPLETION OF PARTS, BEING ESSENTIAL FOR INDUSTRIES THAT SEEK PRODUCTIVITY GAINS. THE MECHANICAL TESTING LABORATORY AT ARCELORMITTAL TUBARãO PRODUCES TEST SAMPLES AND PERFORMS MECHANICAL TESTS ON STEEL PLATES, SUCH AS TRACTION AND CHARPY IMPACT. IN THIS LABORATORY A NEW MACHINING CENTER WITH A CLAMPING SYSTEM WAS INSTALLED AND DEVELOPED TO INCREASE PRODUCTIVITY IN THE PREPARATION OF TEST SAMPLES. THE OBJECTIVE OF THIS WORK IS TO EVALUATE THE PRODUCTIVITY INCREASE OF THIS NEW EQUIPMENT, AIMING TO OPTIMIZE THE PRODUCTION OF STEEL SAMPLES IN THE LABORATORY. IN THE NEW CONDITION AN INCREASE IN THE MACHINING TIME FOR THE TRACTION CP WAS OBSERVED, BUT WITH A LARGER NUMBER OF TEST SAMPLES. IN THE CP’S OF CHARPY TESTS, A SUBSTANTIAL REDUCTION IN PREPARATION TIME WAS EVIDENT, ESPECIALLY SINCE USING ONLY ONE PIECE OF EQUIPMENT FOR THIS PURPOSE.

Keywords

Centro de usinagem; Corpos de prova; Laboratório de ensaios mecânicos; Produtividade

Machining center; Samples; Mechanical testing laboratory; Productivity