According to CST’s Environmental Policy and within the context of its Entrepreneurial Planning 2003/2007, which guides the sustainable development actions, the CDM Projects has been developed due to specific projects at the operational units. This is an approach based mainly in the potential carbon credits generation due to new operational units and process, associated to the energy co-generation. CST is an integrated steel plant, coke based, with an annual production of 5,0 Mt (slabs and coils). According to the nature of its process, it has the carbon as main reduction agent. The carbon credits generation is intimately related to the metallurgic associated process knowledge, and also to the energy co-generation due to CST energy model, using the internal gas production. This paper shows the evolution of the process at CST, since the first study done for the orientation of the hole project, until de Baseline Validation Step, that is the current status of the project. The potential of carbon credits evaluated in this paper, according to CST actual production stage, is estimated in 47.000 tons of CO2 per year.
According to CST’s Environmental Policy and within the context of its Entrepreneurial Planning 2003/2007, which guides the sustainable development actions, the CDM Projects has been developed due to specific projects at the operational units. This is an approach based mainly in the potential carbon credits generation due to new operational units and process, associated to the energy co-generation. CST is an integrated steel plant, coke based, with an annual production of 5,0 Mt (slabs and coils). According to the nature of its process, it has the carbon as main reduction agent. The carbon credits generation is intimately related to the metallurgic associated process knowledge, and also to the energy co-generation due to CST energy model, using the internal gas production. This paper shows the evolution of the process at CST, since the first study done for the orientation of the hole project, until de Baseline Validation Step, that is the current status of the project. The potential of carbon credits evaluated in this paper, according to CST actual production stage, is estimated in 47.000 tons of CO2 per year.
Keywords
Environment, Sustainable Development, electricity generation
Environment, Sustainable Development, electricity generation
How to refer
Abreu, Guilherme Corrêa;
Morimoto, Tsutomu;
Barbosa, Alexandre Rosado;
Kimrse, Odair José;
Sampaio, Carlos Henrique;
Régio, Antônio Avancini;
Júnior, Roberto da Cruz;
Pinho, Jarildo Francisco;
Fujihara, Marco Antônio;
Delpupo, Carlos Henrique.
DEVELOPMENT OF CLEAN DEVELOPMENT MECHANISM (CDM) PROJECT AT CST
,
p. 83-93.
In: 25º Seminário de Balanços Energéticos Globais e Utilidades e 11º Encontro de Produtores e Consumidores de Gases Industriais,
Florianópolis - SC,
2004.
ISSN: 2594-3626
, DOI 10.5151/2594-3626-0010