ISSN 2594-5300
52º Seminário de Aciaria, Fundição e Metalurgia de Não-Ferrosos — vol. 52, num.52 (2023)
Title
Authorship
DOI
Downloads
Abstract
After about two and a half years of interruption in production, the ArcelorMittal Group decided to resume operations at the ArcelorMittal Sul-Fluminense steel mill. The first month of operation showed that several key performance indicators were out of goals combined, such as power-on, tap-to-tap time, electric energy consumption, oxygen consumption and others. This paper aims to present the teamwork carried out between Lumar Metals and ArcelorMittal after the commissioning of EAF #2, implementing the reengineering of the chemical package equipment and adjustments of the electrical and chemical program until the goals were achieved
After about two and a half years of interruption in production, the ArcelorMittal Group decided to resume operations at the ArcelorMittal Sul-Fluminense steel mill. The first month of operation showed that several key performance indicators were out of goals combined, such as power-on, tap-to-tap time, electric energy consumption, oxygen consumption and others. This paper aims to present the teamwork carried out between Lumar Metals and ArcelorMittal after the commissioning of EAF #2, implementing the reengineering of the chemical package equipment and adjustments of the electrical and chemical program until the goals were achieved
Keywords
Commissioning, Chemical energy, EAF Skull Formation, Electric Arc Instability
Commissioning, Chemical energy, EAF Skull Formation, Electric Arc Instability
How to refer
Wandekoken, Thiago Pinto.
EAF RESTART AT ARCELORMITTAL SUL-FLUMINENSE: PROBLEMS AND SOLUTIONS TO REACH PROCESS PERFORMANCE GOALS
,
p. 494-506.
In: 52º Seminário de Aciaria, Fundição e Metalurgia de Não-Ferrosos,
São Paulo,
2023.
ISSN: 2594-5300
, DOI 10.5151/2594-5300-39893