Abstract

Este artigo trata da implantação de um Projeto Piloto na Aperam utilizando o modelo de negócio conforme a Lei de Eficiência Energética, com o objetivo de economizar energia elétrica, abrindo caminhos para que outros projetos possam ser desenvolvidos através do mesmo modelo. No ano 2000, a ANEEL homologou uma Lei de Eficiência Energética, que exige das concessionárias de energia elétrica o investimento de recursos em Programas de Eficiência Energética com o objetivo de reduzir o consumo de energia elétrica. Todos os projetos executados nessa modalidade cujo beneficiário tenha fins lucrativos, devem ser feitos mediante Contrato de Desempenho. A aquisição e instalação de equipamentos são feitas através de recursos financeiros da Concessionária, sendo que a certificação da economia de energia é feita baseada em metodologia específica de Medição & Verificação (M&V), que compara as situações anterior e posterior à implantação do projeto. Os pagamentos são efetuados em parcelas menores ou iguais à economia verificada. O piloto consistiu em modernizar o atual sistema de alimentação em corrente contínua (CC) das pontes rolantes que atendem ao setor de “Fornos Elétricos a Arco” (FEAs) da Aciaria 1 da APERAM. A metodologia foi aplicada na substituição do grupo motor/gerador de alimentação em corrente contínua das pontes rolantes dos FEAs por um painel com retificador. Esse sistema apresenta maior eficiência energética, confiabilidade e tem benefícios adicionais como redução de ruído e calor na sala elétrica e dos custos com manutenção do sistema antigo.

 

This article covers the establishment of a Pilot Project in APERAM using the business model according to the Energy Efficiency Law, in order to save electrical energy, opening the way for other projects can be developed using the same model. In 2000, ANEEL approved an Energy Efficiency Law, which requires Energy Companies from investing resources in Energy Efficiency Programs with the goal of reducing energy consumption. All the projects executed in this mode in which de company aims to profit, must be made by a Performance Contract. During the process of acquiring equipment and implementing the project, all necessary resources for these operations will be available from the Energy Company. At the end of the project, after measurement and verification process, the client shall make a refund to the energy company in monthly installments values less than or equal to the economy effectively checked. The methodology was applied in the replacement of a group of AC motor/ DC generator that feeds electric arc furnace’s cranes in Meltshop of Aperam, by a rectifier. This system has more energy efficiency, reliability, and has additional benefits such as reduced noise and heat in the electrical room and less maintenance costs.

Keywords

Eficiência energética; Projeto piloto; Contrato de desempenho.

Energy efficiency; Pilot project; Performance contract.

How to refer

Fabri, David Fagundes; Pessoa, Isac Quintão; Miranda, Luciano Lellis; Júnior, Benjamin Fullin; Cruz, Cesar Augusto; Lins, Vanessa de Freitas Cunha; Silva, Bruno de Araújo e. IMPLANTAÇÃO DE PROJETO PILOTO UTILIZANDO MODELO DE NEGÓCIO CONFORME A LEI DE EFICIÊNCIA ENERGÉTICA , p. 158-167. In: 32º Seminário de Balanços Energéticos Globais e Utilidades e 26º Encontro de Produtores e Consumidores de Gases Industriais, Salvador, 2011.