Abstract

ESTE TRABALHO TEM COMO OBJETIVO APRESENTAR O PROJETO DO SISTEMA DE REFRIGERAçãO DA RAMPA DO ALTO-FORNO 1, BEM COMO O PLANEJAMENTO, A IMPLANTAçãO E OS RESULTADOS ALCANçADOS NA APERAM SOUTH AMERICA. EM VIRTUDE DOS PROBLEMAS DE TRINCAS NA CHAPARIA DURANTE A CAMPANHA DO ALTO-FORNO, FOI LEVANTADO AS ALTERNATIVAS DE MELHORIA NA REFRIGERAçãO DO ALTO-FORNO 1, E O CONCEITO ADOTADO FOI A INSTALAçãO DE JAQUETAS DE AçO (CAIXAS) NA CHAPARIA EXTERNA DO ALTO-FORNO PARA REFRIGERAçãO DA RAMPA. O PROJETO FOI IMPLANTADO COM êXITO E ENTREGUE àS EQUIPES DE OPERAçãO E MANUTENçãO DA REDUçãO NO DIA 18/01/2022. APóS A IMPLANTAçãO O SISTEMA ESTá OPERANDO SEM NENHUMA OCORRêNCIA DE PROCESSO/OPERAçãO, SENDO AGORA POSSíVEL NAS PARADAS PREVENTIVAS MANTER A CHAPARIA REFRIGERADA, MANTENDO A INTEGRIDADE, PROPORCIONANDO MAIOR SEGURANçA AO PROCESSO E VIDA úTIL DA CHAPARIA.

 

IN THIS PAPER, WE AIM TO PRESENT THE DEVELOPMENT AND IMPLEMENTATION OF THE BLAST FURNACE 1 BOSH COOLING SYSTEM PROJECT, AS WELL AS THE PLANNING, IMPLEMENTATION AND RESULTS ACHIEVED AT APERAM SOUTH AMERICA. DUE TO THE PROBLEMS OF CRACKS IN THE SHELL DURING THE BLAST FURNACE CAMPAIGN, ALTERNATIVES FOR IMPROVING THE COOLING OF BLAST FURNACE 1 WERE RAISED, AND THE CONCEPT ADOPTED WAS THE INSTALLATION OF EXTERNAL PLATES OF STEEL IN THE SHELL TO COOLING THE BOSH. THE PROJECT WAS SUCCESSFULLY IMPLEMENTED AND HANDED OVER TO THE REDUCTION OPERATION AND MAINTENANCE TEAMS ON 01/18/2022. AFTER IMPLEMENTATION, THE SYSTEM IS OPERATING WITHOUT ANY PROCESS/OPERATION INCIDENTS, AND IT IS NOW POSSIBLE DURING PREVENTIVE STOPS TO KEEP THE SHELL COOLED, MAINTAINING INTEGRITY, PROVIDING GREATER SAFETY TO THE PROCESS AND THE USEFUL LIFE OF THE SHELL.

Keywords

Alto-forno; Reforma; Refrigeração; Rampa.

Blast furnace; Reline; Cooling System; Bosh.

How to refer

PONTES, FILIPE SOARES; MOTA, RENATO FERREIRA; CASTRO, DOUGLAS VINICIUS FERREIRA DE; PEREIRA, EMANOELLE SILVEIRA; SOUZA, WARLEN GERALDO G. DE; FERREIRA, HEBER AUGUSTO VIEIRA; PONTES, FILIPE SOARES. IMPLANTAÇÃO DO NOVO SISTEMA DE REFRIGERAÇÃO DA RAMPA DO ALTO-FORNO 1 DA APERAM SOUTH AMERICA , p. 444-457. In: 52º Seminário de Redução de Minérios e Matérias-Primas, São Paulo, Brasil, 2024.