After a restructuring process of the steel industry in the Rhine/Ruhr region in the last ten years, ThyssenKrupp Stahl is today in an excellent situation to produce up to 12 million t hot metal in one integrated plant. This presentation will focus on the evolution of ironmaking practice at TKS and highlight the main aspects to optimise the hot metal costs: Raw material logistics at ThyssenKrupp Stahl; New coke oven plant and the quality requirements for coke; Sinter plant and the requirements for ferrous burden materials; The blast furnaces at ThyssenKrupp Stahl; The operational experiences of the TKS blast furnaces; Zero waste concept; Blast furnace hot metal production – further outlook.
After a restructuring process of the steel industry in the Rhine/Ruhr region in the last ten years, ThyssenKrupp Stahl is today in an excellent situation to produce up to 12 million t hot metal in one integrated plant. This presentation will focus on the evolution of ironmaking practice at TKS and highlight the main aspects to optimise the hot metal costs: Raw material logistics at ThyssenKrupp Stahl; New coke oven plant and the quality requirements for coke; Sinter plant and the requirements for ferrous burden materials; The blast furnaces at ThyssenKrupp Stahl; The operational experiences of the TKS blast furnaces; Zero waste concept; Blast furnace hot metal production – further outlook.
Keywords
raw material logistics, blast furnace operation, cost reduction, zero waste, ironmaking
raw material logistics, blast furnace operation, cost reduction, zero waste, ironmaking
How to cite
Peters, Michael; Schmöle, Peter; Korthas, Bernd; Rüther, Peter.
Improving productivity and reducing costs at the blast furnace - The experience of TKS -,
p. 903-918.
In: 34º Seminário de Redução de Minério de Ferro e Matérias-Primas,
None,
2004.
ISSN: 2594-357X, DOI 10.5151/2594-357x-34Red-903-918