ISSN 2594-5297
41º Seminário de Laminação, Processos e Produtos Laminados Revestidos — vol. 41, num.41 (2004)
Title
Authorship
DOI
Downloads
Abstract
In this paper we describe a solution developed by AISystems for capacity planning optimisation at Siderar, Argentina. The solution combines several mathematical techniques in order to consider complex production constraints like campaign constraints, plant work calendar, maintenance constraints, inventory constraints, orders due dates, products alternative routings. Expected results are lower production costs, lower and better stock mix, optimal resource usage.
In this paper we describe a solution developed by AISystems for capacity planning optimisation at Siderar, Argentina. The solution combines several mathematical techniques in order to consider complex production constraints like campaign constraints, plant work calendar, maintenance constraints, inventory constraints, orders due dates, products alternative routings. Expected results are lower production costs, lower and better stock mix, optimal resource usage.
Keywords
capacity planning, optimisation
capacity planning, optimisation
How to refer
Demidchuk, Roberto;
Molinari, Diego;
Sanchez, Gustavo;
Beghin, Pierre;
Reizig, Wafa;
Parrini, Simone.
INTEGRATED SCHEDULING FOR COLD MILL PLANTS: AN APPLICATION OF STEELPLANNER® MODULES AT SIDERAR
,
p. 720-725.
In: 41º Seminário de Laminação, Processos e Produtos Laminados Revestidos,
Joinville - SC,
2004.
ISSN: 2594-5297
, DOI 10.5151/2594-5297-0073