Proceedings of the Seminar on Energy, Utilities and Industrial Gases


ISSN 2594-3626

Title

MELHORIAS NA SELETIVIDADE DO SISTEMA ELÉTRICO DA UPV

IMPROVEMENT IN THE SELECTIVITY OF THE UPV ELECTRICAL SYSTEM

DOI

10.5151/2594-3626-0021

Downloads

Abstract

O sistema de energia elétrica da Usina Presidente Vargas (UPV) da Companhia Siderúrgica Nacional (CSN) é composto de vários relés de proteção ao longo de todo o sistema de distribuição (138 kV, 13.8 kV, 2.4 kV e 480 V). Estes equipamentos têm que ser coordenados entre si de forma a garantir que o mais próximo da falha atuará primeiro, garantindo assim que outros equipamentos não sejam desligados indevidamente e desta forma outros processos não sofram interferências indevidas. O que motivou o desenvolvimento deste trabalho foi justamente a ocorrência de atuações indevidas de relés de proteção, que estavam atuando de forma descoordenada. Chegou-se então a conclusão da necessidade de uma revisão em todo o sistema de ajustes e calibração dos relés de proteção e todos os periféricos envolvidos para garantir o princípio da seletividade, ou seja, garantir a atuação apenas do relé mais próximo. Por se tratar de um trabalho altamente complexo, pois envolvida toda a UPV nos níveis de tensão já mencionados, o trabalho durou 3(três) anos e vários estudos e testes em campo se fizeram necessários, bem como correções em anormalidades encontradas em campo, visando alcançar o objetivo do trabalho desenvolvido. Outro ganho deste trabalho é possuir recursos, como software e laudos de testes em equipamentos, que auxiliam a agir preventivamente na extensão indesejável dos efeitos decorrentes de falhas elétricas em todo o sistema da UPV, contribuindo para minimizar os danos causados.

 

The electric power system of the Usina President Vargas (UPV) of the Companhia Siderúrgica Nacional (CSN) is composed of some relays of protection throughout all the distribution system (138kV, 13.8kV, 2.4kV and 480V). These equipment has that to be co- ordinate between itself of form to guarantee that next to the imperfection it will act first, guaranteeing as soon as other equipment they are not off improperly and in such a way other processes do not suffer improper interferences. What it motivated the development of this work was exactly the occurrence of improper performances of protection relays, which were acting of disarranged what had been coordinated form. One arrived then the conclusion of the necessity of a revision in all the system of adjustments and calibration of the protection relays and all the involved peripherals to guarantee the beginning of the selectivity, that is, to guarantee the performance only of the relay next. For if dealing with a highly complex work, therefore involved all the UPV in the mentioned levels of tension already, the work lasted 3 (three) years and some studies and tests in field they had made necessary, as well as corrections in abnormalities found in field, aiming at to reach the objective of the developed work. Another profit of this work is to possess resources, as software and findings of tests in equipment, which assists to act preventively in the undesirable extension of the resulting from effects of electric imperfections in all the system of the UPV, contributing to minimize the actual damages.

Keywords

Corrente de curto circuito; Relés de proteção; Seletividade.

Short circuits current; Relays of protection; Selectivity.

How to refer

Martins, Hamilton Geraldo; Sampaio, Max Gleik; Soares, João Manoel; Souza, Carlos Luiz Machado de; Santos, Cosme Luiz dos. MELHORIAS NA SELETIVIDADE DO SISTEMA ELÉTRICO DA UPV , p. 184-192. In: 30º Seminário de Balanços Energéticos Globais e Utilidades e 24º Encontro de Produtores e Consumidores de Gases Industriais, São Paulo, 2009.
ISSN: 2594-3626 , DOI 10.5151/2594-3626-0021