ISSN 2594-5335
19º Seminário de Automação & TI — vol. 19, num.19 (2015)
Title
Authorship
DOI
Downloads
Abstract
In October 2013 JSW Steel decided to place an order to Primetals Technologies Austria (former Siemens VAI Metals Technologies) for the installation of a comprehensive Level 2 process optimization system for more than 20 existing production facilities of various suppliers. For SMS-I new L2 systems are provided for two hot metal pretreatment stations, three hot metal desulphurization stations, three ladle furnaces, two 1-strand slab casters, a ladle tracking system as well as a shop supervisory system. Additionally the existing L2 system for one 1-strand slab caster is being upgraded in the course of the project. In SMS-II new L2 systems for the 7 hot metal desulphurization stations, 4 ladle furnaces, 1 new RH vacuum degasser, ladle tracking system and a shop supervisory system are supplied. Despite of the challenging time schedule the commissioning of the single facilities started within less than 12 month after contract effectiveness. The installed Level 2 process optimization systems together with the achieved results are described in this paper.
Keywords
Steel plant automation, Primetals Technologies, Process optimization, JSW steel plant, Level 2 automation
Level 2 automation
How to refer
Hubmer, Rudolf;
Weiss, Josef;
Desai, N..
NEW LEVEL 2 AUTOMATION SYSTEMS FOR JSW STEEL TORANAGALLU
,
p. 247-257.
In: 19º Seminário de Automação & TI,
Rio de Janeiro,
2015.
ISSN: 2594-5335
, DOI 10.5151/2237-0234-26936