Proceedings of the Seminar on Energy, Utilities and Industrial Gases


ISSN 2594-3626

Title

RECUPERAÇÃO POR MONTAGEM DE MEIA CANA DA TUBULAÇÃO DE COG PARA CTE

RECOVERY WITH HALF-ROUND PIPE ASSEMBLY IN COG GÁS GRIDS

DOI

10.5151/2594-3626-23878

Downloads

Abstract

Durante o processo de fabricação de aço são geradas grandes quantidades de gases, subprodutos oriundos das unidades de Coqueria, Coke over Gas (COG), Altos fornos, Blast Furnace Gas (BFG) e Aciaria, LD Gas (LDG). A ArcelorMittal Tubarão reaproveita todos estes gases como fonte de energia. A maior parte dos gases gerados e consumida nas Centrais Termelétricas (CTE) para a geração de energia elétrica e sopro de ar para os Altos Fornos. Todos os gases são transportados através de tubulações. A rede de Gás COG que alimenta as CTE está em operação ininterrupta desde o início de operação da usina, há 30 anos, e estava com alta taxa de corrosão interna, com ocorrência de vários pontos de vazamento. Em virtude de esta rede ser única, não é possível a parada da mesma por um período prolongado para troca de trechos avariados, portanto foi realiza a montagem de meia cana na geratriz inferior da rede com a mesma em operação. Com este procedimento foi possível reparar toda a extensão de tubulação avariada sem nenhuma interrupção de fornecimento de COG para as CTE.

 

Steel production process generates large amounts of gases, sub products derived from the various units: Coke plant, Coke over Gas (COG), Blast furnaces, Blast Furnace Gas (BFG) and Steelmaking, LD Gas (LDG). ArcelorMittal Tubarão reuses all these gases as an energy source. Roughly half of the gas generated is consumed in power plants (PP) for the generation of electricity and blowing air into the blast furnaces. All gases are transported through pipelines. The gas grid that feeds COG to the power plant is in continuous operation since the beginning of operation of the plant, 30 years ago, and has a high rate of internal corrosion, with the occurrence of various leak points. Because there is no alternative line, this part of the grid cannot be shut down for a long period of time for maintenance purpose, and therefore the present solution was adopted, that is, a half-round pipe was assembled on this line. With this procedure it was possible to repair all the damaged pipe extension without any COG supply interruption.

Keywords

Meia cana; Coke over Gas (COG), Centrais termelétricas.

Half-round; Coke over Gas; Power plant.

How to refer

Dias, Rogélio. RECUPERAÇÃO POR MONTAGEM DE MEIA CANA DA TUBULAÇÃO DE COG PARA CTE , p. 257-269. In: 34º Seminário de Balanços Energéticos e 28º Seminário de Gases Industriais, São Paulo, 2013.
ISSN: 2594-3626 , DOI 10.5151/2594-3626-23878