Proceedings of the Ironmaking, Iron Ore and Agglomeration Seminars


ISSN 2594-357X

Title

REPARO A QUENTE NOS COLETORES DE GASES DE COMBUSTÃO ATRAVÉS DA PROJEÇÃO DE MASSA REFRATÁRIA COM VIDEO MONITORAMENTO

REPAIR IN HOT CONDITION OF THE GASES’ COLLECTORS THROUGH PROJECTION OF REFRACTORY MASS USING VIDEO MONITORING

DOI

10.5151/2594-357X-28115

Downloads

Abstract

O processo de coqueificação em uma Coqueria do tipo Heat Recovery é baseado na queima da matéria volátil presente no carvão, principal combustível para aquecimento dos fornos. A Combustão dos gases tem que ocorre dentro da câmara primaria (interior do forno) e na câmara secundaria (Sole Flue). Devido a algumas interferências no processo de coqueificação não ocorre a queima completa dos gases no forno e com isso a combustão terciária ocorre nos coletores de gases (equipamento destinado apenas para transporte dos gases de combustão). Com a queima dos gases nos coletores temos o aumento de temperatura no interior do duto e como a estrutura refratária não foi projetada para suportar esse limite máximo de temperatura acontece a contração e posteriormente colapso do refratário causando perdas em todo o processo. Os principais benefícios após a aplicação dessa técnica é a redução no tempo de reparo, aumento do rendimento de aplicação da massa refratária e prolongamento na vida útil desse equipamento.

 

In the heat-recovery cokemaking process, the complete gas produced from coal carbonization is combusted directly inside the coke oven, thus creating the heat needed for carbonization. The burning of the volatiles has to occur in the primary chamber (internal oven) and in the secondary chamber (sole flue). Due to interferences on the coking process, the gas is not completed burned in the furnaces; hence its complete burning occurs in the gas ducts (equipment designed only to transport combustion gases). Due to the burning of the gases in the ducts, the temperature inside the collector rises above the limit it was originally designed to support, therefore the refractory structure shrink and consequently collapses causing losses to the process. The main benefits gained after the performance of this technique are; reduction on the repairing time, increase on the performance of the refractory mass application and extension of the life cycle of the equipment.

Keywords

Coqueria Heat Recovery, Combustão, Refratário, Controle por PID

Heat Recovery Coke Plant, Combustion, Refractory and PID Controller

How to refer

Henrique, Neussias Inocêncio; Fonseca, Giovani; Azevedo, Sandro; Willians, Brian; Coelho, Robson Jacinto; Humberto, Charles; Miranda, Raphael. REPARO A QUENTE NOS COLETORES DE GASES DE COMBUSTÃO ATRAVÉS DA PROJEÇÃO DE MASSA REFRATÁRIA COM VIDEO MONITORAMENTO , p. 749-754. In: 46º Seminário de Redução/ 17º Minério de Ferro/ 4º Aglomeração, Rio de Janeiro, 2016.
ISSN: 2594-357X , DOI 10.5151/2594-357X-28115