ISSN 2594-3626
Title
Authorship
DOI
Downloads
Abstract
A CLE Brasil possui uma subestação de 230kV que apresentou sérios problemas de trincas e rachaduras nas estruturas de concreto após alguns anos. Em alguns pontos a ameaça de queda era real. Foi iniciado um estudo de patologia das estruturas de concreto, com uma empresa especializada em recuperação estrutural para conhecer as causas e recomendar a melhor terapia estrutural a ser realizada. Após o estudo, definiu-se a terapia adequada das estruturas. Esta atividade foi classificada como de grande risco e teve foco na segurança da equipe e operação do sistema, de modo que todo o serviço fosse executado sem quaisquer incidentes as pessoas, ao meio ambiente e ou interrupções de energia elétrica. Havia desafios como realizar manutenção nas proximidades da linha viva, serviços em altura com utilização de andaimes, período de chuvas e ventos, trocas de equipes e anomalias. As estruturas tratadas foram Pórticos com 17 metros de altura, postes e suportes para isoladores, TPs, TCs, Seccionadoras e Transformadores. A atividade durou 04 meses e contabilizou 5.752 horas de trabalho. Os resultados foram significativos e dentro do esperado, sem ocorrência de incidentes, prolongamento da vida útil e aumento considerável da segurança da equipe e do sistema de distribuição.
CLE Brazil has a 230kV substation which presented serious problems of cracks and disruptions in the concrete structures after a few years. At some points the threat of falling was real. A study of pathology of concrete structures with a company specialized in structural repair was initiated to know the causes and recommend the best structural therapy to be performed. After the study, it was defined the appropriate structures therapy. This activity was classified as high risk and had the team focus on safety and operation of the system, so that all the work was carried out without any incidents to people, to the environment and or power outages. There were challenges such as performing maintenance near the live line, services in height with use of scaffolding, period of rains and winds, team exchanges and anomalies. The structures were Porches with 17 meters height, poles and brackets for insulators, TPs, TCs, transformers and disconnectors. The activity lasted 04 months and recorded 5752 hours of work. The results were significant and as expected, without any incidents, life extension and substantial increase in staff safety and the distribution system.
Keywords
Terapia estrutural; Segurança; Manutenção; Vida útil
Structural therapy; Safety; Maintenance; Life extension
How to refer
Robson Gambeta.
SEGURANÇA NA RECUPERAÇÃO DAS ESTRUTURAS DE CONCRETO DE UMA SUBESTAÇÃO 230KV
,
p. 4311-4319.
In: 35° Seminário de Balanços Energéticos Globais e Utilidades e 29° Encontro de Produtores e Consumidores de Gases Industriais,
São Paulo - Brasil,
2014.
ISSN: 2594-3626
, DOI 10.5151/2594-3626-25263