Proceedings of the Automation & IT Seminar


ISSN 2594-5335

Title

TERNIUM MEXICO SUPPLY CHAIN INTEGRATION PROJECT WITH STEELPLANNER

PROJETO DE INTEGRAÇÃO DA ‘SUPPLY CHAIN’ DE TERNIUM MEXICO COM STEELPLANNER

DOI

10.5151/2594-5335-0031

Downloads

Abstract

Ternium Mexico integrated former Hylsa and Imsa companies, and transformed in a new entity, required new operation possibilities and perspectives. The purpose of this paper is to describe the implementation of an integrated production planning system to attend gradually the different planning and scheduling challenges of Ternium Mexico, using SteelPlanner modules, in cooperation with A.I.Systems.

 

Ternium Mexico integra as antigas companhias Hylsa e Imsa, e se transformou numa nova entidade, oferecendo novas possibilidades operacionais assim como novas perspectivas. O objetivo deste documento é de descrever a implantação de um sistema de planejamento da produção que atende gradualmente aos diferentes desafios de planejamento e programação de Ternium Mexico, usando os módulos SteelPlanner, em cooperação com a A.I. Systems.

Keywords

Production planning; Production scheduling; Slab assignment; Coil assignment; Optimisation.

Planejamento de produção; Programação da produção; Alocação de placas; Otimização.

How to refer

Tenorio, Esther; Halun, Alfredo; Montemayor, Raymundo; Castro, Pedro; Beghin, Pierre; Meta, Eric; Moinier, Pascal. TERNIUM MEXICO SUPPLY CHAIN INTEGRATION PROJECT WITH STEELPLANNER , p. 278-286. In: 12º Seminário de Automação de Processos, Vitória, 2008.
ISSN: 2594-5335 , DOI 10.5151/2594-5335-0031