Abstract

A MOAGEM DE MINéRIOS EM MOINHOS DE BOLAS CONVENCIONAIS DEMANDA ELEVADO CONSUMO DE ENERGIA, RESULTANDO EM CUSTOS OPERACIONAIS SIGNIFICATIVOS EM UMA USINA INDUSTRIAL DE PROCESSAMENTO MINERAL. SEJA NAS ETAPAS INICIAIS DE UM PROJETO OU DURANTE SUA OPERAçãO, A REALIZAçãO DE ENSAIOS PARA DETERMINAR O CONSUMO DE ENERGIA DO CIRCUITO DE PROCESSAMENTO AO LONGO DA VIDA DA MINA é NECESSáRIA PARA REDUZIR CUSTOS OPERACIONAIS TãO ELEVADOS. OS ENSAIOS TRADICIONAIS UTILIZADOS PARA DEFINIR O CONSUMO DE ENERGIA NA MOAGEM SãO RELATIVAMENTE DEMORADOS E REQUEREM QUANTIDADES SIGNIFICATIVAS DE AMOSTRA, POR EXEMPLO, 8 A 10 KG, O QUE NEM SEMPRE ESTá DISPONíVEL NAS ETAPAS INICIAIS DE UM PROJETO OU ESTUDOS GEOMETALúRGICOS. O PRESENTE ESTUDO UTILIZOU UM ENSAIO DE HARDGROVE MODIFICADO QUE REQUER APENAS APROXIMADAMENTE 50 G PARA ESTIMAR O ÍNDICE DE TRABALHO DE BOND PARA MOINHOS DE BOLAS - BBMWI. ESTE ENSAIO ENVOLVE A MEDIçãO DO TORQUE USANDO UM VOLUME DE AMOSTRA FIXO COM UM TAMANHO DE ALIMENTAçãO DE -3,35+0,60 MM PARA DETERMINAR A ENERGIA ESPECíFICA DA MOAGEM COM UM MOINHO HARDGROVE. OS RESULTADOS INDICARAM QUE, PARA UM CONJUNTO DE 130 AMOSTRAS AVALIADAS, O ERRO MéDIO ASSOCIADO AO BBMWI CALCULADO FOI DE ±6%. O ENSAIO PROPOSTO é, PORTANTO, ADEQUADO PARA ESTUDOS GEOMETALúRGICOS E OUTRAS APLICAçõES ONDE AMOSTRAS RELATIVAMENTE PEQUENAS ESTãO DISPONíVEIS

 

GRINDING ORES IN CONVENTIONAL BALL MILLS DEMANDS HIGH ENERGY CONSUMPTION, RESULTING IN RELATIVELY HIGH OPERATING COSTS IN A MINERAL PROCESSING INDUSTRIAL PLANT. WHETHER IN THE INITIAL STAGES OF A PROJECT OR DURING ITS OPERATION, CONDUCTING TESTS TO DETERMINE THE PROCESSING CIRCUIT'S ENERGY CONSUMPTION THROUGHOUT THE LIFE OF THE MINE IS NECESSARY TO REDUCE SUCH HIGH OPERATING COSTS. TRADITIONAL TESTS USED TO DEFINE THE ENERGY CONSUMPTION IN GRINDING ARE RELATIVELY TIME-CONSUMING AND REQUIRE SIGNIFICANT AMOUNTS OF SAMPLE, E.G., 8 - 10 KG, WHICH IS NOT ALWAYS AVAILABLE IN THE INITIAL STAGES OF A PROJECT OR GEOMETALLURGICAL STUDIES. THE PRESENT STUDY USED A MODIFIED HARDGROVE TEST THAT REQUIRES ONLY AROUND 50 G TO ESTIMATE THE BOND BALL MILL WORK INDEX -BBMWI. THIS TEST INVOLVES THE MEASUREMENT OF THE TORQUE USING A FIXED SAMPLE VOLUME WITH A -3.35+0.60 MM FEED SIZE TO DETERMINE THE SIZE-SPECIFIC ENERGY FROM GRINDING WITH A HARDGROVE MILL. THE RESULTS INDICATED THAT FOR A SET OF 130 SAMPLES TESTED, THE AVERAGE ERROR ASSOCIATED WITH THE PREDICTED BBMWI WAS WITHIN ±6%. THE PROPOSED TEST IS THUS SUITABLE FOR GEOMETALLURGICAL STUDIES AND OTHER APPLICATIONS WHERE RELATIVELY SMALL SAMPLES ARE AVAILABLE.

Keywords

Geometalurgia; Índice de Trabalho de Bond; Cominuição; Moinho Hardgrove.

Geometallurgy; Bond Ball Work Index; Comminution; Hardgrove mill.