Proceedings of the Ironmaking, Iron Ore and Agglomeration Seminars


ISSN 2594-357X

Title

REPARO DO ALTO-FORNO 1 DA USIMINAS IPATINGA

REPAIR OF USIMINAS IPATINGA BLAS FURNACE #1

DOI

10.5151/2594-357X-32135

Downloads

Abstract

O Alto-Forno 1 (AF1) da Usiminas teve seu primeiro acendimento (blow-in) em 1962 e sua última reforma (relining) em 1997. Devido à queda da demanda por aço, o AF1 interrompeu suas atividades duas vezes, uma em 2008 (blow-in em 2010) e a última em 01/06/2015 (blow-in em 03/04/2018). O último reparo previa restabelecer a produção diária de 2.000 t, a segurança operacional e a confiabilidade do equipamento até a próxima reforma. Durante a execução desse reparo, ocorreu a necessidade de substituição de um anel completo da carcaça na região da rampa e a recuperação de todos os refratários da rampa e ventre. Também foi necessária a demolição e recuperação de cerca de 400 t de refratários nos três regeneradores e modificações na sua estrutura de sustentação. Apesar de todos os desafios enfrentados durante a execução do reparo do Alto-Forno 1, o projeto foi concluído com sucesso dentro do orçamento e do prazo iniciais, por uma equipe de Engenharia com idade média de 30 anos e sem experiência em reforma de alto-forno. Atualmente o Alto-Forno 1 opera com a produção diária prevista e com o perfil refratário, o sistema de refrigeração, a carcaça e os regeneradores completamente restaurados.

 

The Usiminas Blast Furnace #1 (BF#1) had your first blow-in in 1962 and its last relining was held in 1997.This blast furnace has to interrupt its operation two times, one was in 2008 (blow-in in 2010) and the last blow-off was in 2015 (blow-in in 2018). The purpose of this last repair was to reestablish the 2,000 tons daily production, operational safety and reliability of the blast furnace until the next relining. During this repair execution it was necessary to replace one complete ring of the shell on bosh region and recover all refractory. Also was necessary demolish and replace 400 tons of refractory in the hot stoves and add new columns in the grill chamber. Despite all the challenges, the project was successfully completed within the initial budget and deadline, with an Engineering team with a mean age of 30 years and no experience with blast furnace repair. Currently, the BF#1 operates with the daily production expected and with the refractory profile, cooling system, shell and hot stoves completely restored.

Keywords

Alto-Forno; Reparo; Usiminas

Blast Furnace; Repair; Usiminas

How to refer

Caracoche, Fernando; Martins, Heltom Muzzi; Albuquerque, Walter Gomes de; Cardoso, Gabriel Viana; Rocha, Larissa Rodrigues de Carvalho. REPARO DO ALTO-FORNO 1 DA USIMINAS IPATINGA , p. 424-433. In: 48° Seminário de Redução de Minérios e Matérias-primas, São Paulo, 2018.
ISSN: 2594-357X , DOI 10.5151/2594-357X-32135